- 770-297-7000
- service@murrayplastics.com
- Mon-Thur: 9am-5pm | Fri: 9am-3:30pm
Your entire plastic part manufacturing process may be seamless. But if you do not set the right lead time and fulfillment parameters, then your seamless manufacturing process will not be fully maximized.
The schedules in setting lead time and fulfillment should not only be considered at the exact moment a client is inquiring about a certain product or service. The moment product or part development starts, the lead time required to fulfill a client’s needs should automatically be considered.
This is to make sure that the entire chain is seen from all perspectives. This means looking not only at the planning, manufacturing, finishing, packaging and distribution processes, but at possible hindrances along the way as well.
Yes, there will always be a few bumps in the road, no matter how perfect your process seems to be. Machinery may break down. Your manpower may drastically decrease. A huge market shift could pull up your costs in a snap. All these could be considered as deterrents in meeting set schedules.
Last modified: January 9, 2024